CBFI has designed, built and provided two large-scale projects for Southeast Asian customers in China. The first-phase project includes quick-freezing warehouses, static pickling rooms, chillers and other supporting equipment. The second-phase project includes a set of double-helix quick-freezing warehouses, a 600㎡ cold storage, a quick freezer.
Customer background introduction
The client is the largest pangasius production enterprise in the world, and an advocate and pioneer of the whole industry chain of pangasius. Its breeding area has reached 6.2 million hectares, its fish fillet production capacity is 1,000 tons, and it has 32 storage centers around the world.
The customer has established a production base in southern China, which mainly processes, produces and sells pangasius, including raw materials, deep-processed products and by-products, and supplies other products such as Qingjiang fish, black fish, and sea bass. The entire production and processing have strict process standards and quality requirements, and it is an enterprise that combines quality and strength.
Enterprise goals and demands
The customer's processing plan is 45 tons per day, but the requirements for the two phases of the project are different.
The first phase of the project needs to be completed and put into operation in a short period of time. The second phase of the project has a large amount of quick-freezing. It is necessary to reduce the power consumption of quick-freezing per ton of goods by 40% while ensuring the daily use needs. Clearly put forward for the energy saving of equipment Require.
Spring Solutions
Pain point 1
Spring Solutions
CBFI adopts direct expansion system.
Direct Expansion System:
The high-pressure refrigerant liquid passes through the thermal expansion valve, and after throttling, it turns into low-temperature and low-pressure wet steam and directly enters the evaporator, and returns to the compressor after absorbing heat and vaporizing.
Advantages of direct expansion system:
The whole system is simple and easy to install. This system is a one-to-one system, that is, one refrigeration unit corresponds to one evaporator end, the oil return is good, it will not affect each other, and the degree of automation is high.
Pain point 2
The second-phase project has a large amount of quick-freezing, and it is necessary to reduce the power consumption of quick-freezing per ton of goods by 40% while ensuring daily use needs.
Spring Solutions
It adopts a flooded barrel pump system, which is suitable for large-scale integrated refrigeration systems.
The barrel pump liquid supply is a refrigeration system that uses the mechanical action of the pump to deliver low-temperature refrigerant liquid to the evaporator. The throttled low-temperature refrigerant liquid first enters a fluorine barrel with a certain liquid storage volume and a certain gas-liquid separation volume, and then transports the low-temperature liquid several times the evaporation capacity to the evaporators in each warehouse. Part of the liquid absorbs heat and vaporizes in the evaporator, and the rest of the liquid returns with the gas through the return pipe. After the gas-liquid separation, the gas is sucked away by the refrigeration compressor, and the separated liquid and the new supplementary liquid equivalent to the evaporation amount are transported to the evaporator for recycling.
Advantages of CBFI flooded bucket pump system
1. The compressors are designed in parallel, and the number of compressors to be turned on is automatically selected according to the number of cold storages opened and the cooling capacity required by the cold storage; at the same time, through valve design control, the compressors are used as backups for each other, increasing the reliability of the system operation.
2. The evaporator of the flooded system has higher evaporation and heat transfer efficiency. For the evaporator with the same evaporation area, the cooling effect of the bucket pump liquid supply is 25%~30% higher than that of the direct expansion liquid supply;
3. The flooded system uses a fluorine pump to supply liquid, which can overcome the loss of part of the resistance in the system and realize long-distance liquid supply.
4. Adopt integrated and innovative oil separation, cooling and oil return technology to ensure that the cooling capacity of the equipment will not decline after long-term use, and ensure that the oil will not go to the low-pressure system.
Pain point 3
The customer's second-phase project has a large amount of quick-freezing, which requires a reduction in operating costs.
Spring Solutions
The flooded bucket pump system used can save customers 450,000 yuan in electricity bills every year while meeting the daily production of 45 tons of quick-frozen goods.
The heat is mainly taken away by the vaporization and absorption of the refrigerant liquid in the evaporator. Therefore, under the condition of ensuring safety, the more refrigerant inside the evaporator, the utilization rate of the evaporator of the flooded refrigeration system is higher than that of the direct expansion refrigeration system. The higher the refrigeration system, the better the cooling effect; usually, when the direct expansion system is shut down, in order to avoid the risk of liquid shock caused by the next startup, it will be evacuated, and there is only a small amount of refrigerant liquid in the evaporator, and the There is still a lot of refrigerant liquid in the evaporator of the flooded system, which can also evaporate and absorb heat when it is shut down, so as to maintain the storage temperature and avoid the rapid temperature rise of the storage. Some, more energy-saving.
Therefore, CBFI recommends that customers can lower the temperature of the warehouse as much as possible at night under the premise of the peak-valley flat electricity price policy, prolong the temperature rise time in the warehouse when the electricity price is high during the day, and reduce the start-up time during the high electricity price period during the day, especially the pipe storage. There is more refrigerant liquid stored in the row pipe, which has better cold storage function.
CBFI has also set up a heat recovery system for customers, which can recover the heat that needs to be drained to generate domestic hot water or heat the ground to prevent freezing.
Pain point 4
The customer said that the air cooler equipment in their production base in the United States has the problem of frequent frosting, which not only consumes energy but also leads to insufficient cooling capacity in the cold storage.
Spring Solutions
CBFI adopts hot gas defrosting, high-pressure exhaust heat supply, high-quality heat source, high defrosting efficiency, clean defrosting, little impact on storage temperature fluctuations, and no additional energy consumption; our flooded system will be based on the temperature of the system Different zones, medium, high and low temperature barrel pump skids are installed, and the barrel pump skids for hallway and high temperature are used not only as a cooling source, but also as a liquid drain bucket for defrosting in the low temperature system, so that the system can be stable even in the state of defrosting run.
Pain point 5
The customer's products need to be produced in an extremely low-speed freezing environment, and the equipment is required to be clean and hygienic to meet the requirements of food safety production, and the production site is limited.
Spring Solutions
A double-screw quick-freezer is used. The internal temperature of the double-screw quick-freezing machine is kept stable at -35°C, and the quick-freezing effect is very good, which is suitable for various fish products of customers. It occupies a small area, adopts a multi-layer spiral structure, and has a large freezing capacity. Its structural design is suitable for assembly line production, and the import and export are at the same height, which is easier to combine with other supporting equipment. The end of the double helix is made of full food-grade stainless steel, which meets the hygienic requirements, is easy to clean, corrosion-resistant, and has a long service life.
Enterprise effect feedback
The customer first purchased the first-phase equipment from our company. Since our sales staff provided professional and reliable service, and the customer also recognized the scale and strength of our company after visiting the factory in person, he continued to choose to cooperate with CBFI for the second phase. . In the second phase of the project, we have lived up to the high expectations of our customers. From the early demand communication, mid-term program planning, and later installation services, all percentages have reached the customer's expected goals. The customer is very satisfied with our service, design planning and products, and said that the equipment in the first and second phases are running stably.
Trust CBFI